咨询服务 培训服务
  肯达信服务热线 CTS 统一客服电话
400-690-0031
 
 
首页>咨询服务>COCA-COLA验厂咨询
COCA-COLA验厂咨询----可口可乐供应商指导原则(十一)独特的评估情况(续)

Unique Assessment Situations

独特的评估情况(续)




Non-Employee Workers (NEW’s) AKA Contract Labor Guidelines

As part of the advance preparation for assessment, the service provider must contact the facility and determine if there are any non employee workers working at the facility. If non employee workers are working at the facility, the service provider should request the number of agencies and number of NEW’s from each agency. If NEW’s comprise less than 10% and less than 50 employees, the service provider should request that the payroll and personnel information be requested from the contract employer. If not available, the auditor should proceed with standard assessment and include contract employees as partof the assessment process based on available documentation. The facility should not be cited for the NEW documentation not being available at the facility.


At facilities where the workforce are largely comprised of contracted workers hired through one or more agencies, the following guidelines apply:

1. If ONE agency is used and employs MORE than 10% of the workforce with a minimum of 50 employees:

a. The NEW workforce will NOT be included in the scope of the assessment.

b. No interviews or document review will be conducted for these workers.

c. TCCC will be notified post assessment of the facility’s use of contracted workers to determine

  if a separate assessment is required.

2. If ONE agency is used and employs LESS than 10% of the workforce and less than 50 employees:

a. The workforce will be included in the assessment and any issues will be reported in the ASR

  as a standard finding.

b. A proportionate number of interviews will be conducted with these worker and any issues will

  be reported in the ASR as standard violation.

c. Any necessary documentation will be requested from the agency. If the agency is unable to

  provide the requested documentation on the day of the assessment, the facility should not be cited.

3. If TWO OR MORE agencies are used and any one agency employs less than 10% of the workforce or

  less than 50 employees:

a. Action mentioned above in (2.) will take place.


Note: All detailed reports should include a section that details for each contract agency

the agency name, the number of employees hired through the agency, and the percentage

of the total workforce contracted through the agency, the Job Function and the type of

employment (Temporary, Part-time or Full-time). If contract agencies provide NEW’s

in multiple job categories, please create a separate entry for each agency and job function.


Sample of Contract Agency Detail:

Contract Agency #1

Agency Name:  Agency One

Address: 123 Main Street, Anytown, USA 12345

Phone: (123) 456-7890

Number of Workers: 30% of Total Workforce: 15%

Job Function: Production

Type of Employment: Temporary, Part-time or Full-time


Multiple Production Locations

If during the course of an assessment, a facility identifies a limited number of the total production buildings as being used for TCCC production, the auditor should assess the entire facility, including all production locations that are owned and operated by that supplier at that location, as one facility.

SA8000

SA8000. 社会责任管理体系认证咨询项目
点击查看

WAL-MART

WAL-MART. 沃尔玛客户验厂咨询项目
点击查看

ISO20000认证咨询

ISO20000. IT服务管理体系国际标准认证咨询介绍
点击查看
客服中心
杨老师
王老师
徐老师
郭小姐
张小姐
陈老师
您好,我是肯达信管理顾问公司客服,欢迎咨询!

杨老师

您好,我是肯达信管理顾问公司客服,欢迎咨询!

王老师

您好,我是肯达信管理顾问公司客服,欢迎咨询!

徐老师

您好,我是肯达信管理顾问公司客服,欢迎咨询!

郭小姐

您好,我是肯达信管理顾问公司客服,欢迎咨询!

张小姐

您好,我是肯达信管理顾问公司客服,欢迎咨询!

陈小姐


客户服务热线

400-690-0031

24小时热线

18576401396


展开客服