咨询服务 培训服务
  肯达信服务热线 CTS 统一客服电话
400-690-0031
 
 
首页>咨询服务>COCA-COLA验厂咨询
COCA-COLA验厂咨询----可口可乐供应商指导原则(十四)呈报规定


Reporting Requirements



Assessment and Assessment Summary Report

These are the standard reports issued for an initial or full assessment report. It implies an assessment against all SGP elements.


Follow-Up Assessment and Follow-Up Assessment Summary Report

These are the reports issued for an assessment geared to verify correction of previously found violations. It is not a full SGP assessment, and can only be done within 6 months of the previous audit. If not completed by this timeframe, a full re-assessment is required. A Follow-Up Assessment Summary Report only includes findings.


Assessment Summary Report Update

This report is only issued in those rare instances where verification of corrective action can be done by the service provider with pictures or documentation, in lieu of a Follow- Up Assessment. However, if a Follow- Up assessment is required to address other issues in the assessment report, the evidence should instead be verified during the Follow- Up Assessment process.


Assessment Ratings & Required Next Steps

The assessment rating, along with the facilities corrective action plan and implementation thereof, determines the appropriate next steps and their timing. Any deviation from TCCC defined timing for Follow Up Assessments and/or Re- Assessments must be approved by WA. A summary of assessment ratings is below.


RatingDefinitionScoreNext Steps
GreenIn compliance0Re-assess in 1-3 years, depending on risk
YellowMinor noncompliance1-7

Compliance can be demonstratedthrough documentation or photos that confirm correction typically within 3 months of the assessment date. Re-assessment in 3 years, depending on risk.


OrangeModerate noncompliance8-27Most Orange facilities requirea follow-up assessment, typically within 6 months.

In rare instances where a WAM waives that requirement, compliance can be demonstrated through documentation or photos that confirm correction typically within 3 months of the assessment date.


RedSignificent noncompliance28+

Facility Action Plan within 30days from assessment  date,  corrective  action implemented, Follow-Up  Assessment typically within 6 months










SA8000

SA8000. 社会责任管理体系认证咨询项目
点击查看

WAL-MART

WAL-MART. 沃尔玛客户验厂咨询项目
点击查看

ISO20000认证咨询

ISO20000. IT服务管理体系国际标准认证咨询介绍
点击查看
客服中心
杨老师
王老师
徐老师
郭小姐
张小姐
陈老师
您好,我是肯达信管理顾问公司客服,欢迎咨询!

杨老师

您好,我是肯达信管理顾问公司客服,欢迎咨询!

王老师

您好,我是肯达信管理顾问公司客服,欢迎咨询!

徐老师

您好,我是肯达信管理顾问公司客服,欢迎咨询!

郭小姐

您好,我是肯达信管理顾问公司客服,欢迎咨询!

张小姐

您好,我是肯达信管理顾问公司客服,欢迎咨询!

陈小姐


客户服务热线

400-690-0031

24小时热线

18576401396


展开客服